===[[Getting Started]]===
 
===[[Getting Started]]===
 
===[[Layers versus Pie Slices versus Boxes versus Steps]]===
 
===[[Layers versus Pie Slices versus Boxes versus Steps]]===
 
+
===[[Some Editing Suggestions]]===
===Some Editing Suggestions===
 
#When you start a new project, it might be easiest to first think about the major pieces of your project - make those into Boxes
 
#Write down the steps you have in mind, add the first step, write down the step, hit enter, write the next step, hit enter, etc.
 
#When the steps start falling off your screen, think about creating a new Box to break down the steps into manageable chunks
 
#Re-read your steps, order them so it makes sense to you, then assign people (when you are working in Projects) or roles (when you are working in Templates) by opening the first step, assigning the person/role. Then notice the little blue arrows on the bottom of the wizard which allow you to move to the next step to assign a person/role, move to the next step, etc.
 
#Think about duration of a step, again click on the first step and edit the duration, then move down within the wizard to the next step. Duration should take into account not just how long the task takes but how long it will realistically take for somebody to get to it, do it, let you know that it is done - this means a 20 min tasks might need a 5 day duration...
 
#Are there steps that are dependent on a different step? Set that dependency by clicking on the Link when you hover over the step that is dependent on a different step; if the steps are sequenced, i.e., Step 1 needs to be done for Step 2 to happen which needs to be done for Step 3 to happen etc., then you can "Sequence" all the steps in a box by clicking on the gear in the lower right-hand corner of the box and clicking on "Sequence Steps"
 
#Are there any documents or links you'll need? Add them by clicking on "Files" when you hover over the appropriate step
 
#Last, but not least, when you are in a Project (not a template), go to the "Planning" tab (on the right side) and start planning by entering dates, make sure to click on the first slice so that no boxes can be seen, that will ensure that you see all steps in all slices and all boxes when you are planning the timeline for the entire project
 
  
 
===Issues versus Risks===
 
===Issues versus Risks===

Revision as of 12:58, 5 December 2014

Welcome

Purpose of the PIEmatrix Wiki

Welcome to the PIEmatrix Wiki. This Wiki contains publicly accessible documentation contributed and maintained by anybody interested in working with PIEmatrix.

What goes in the PIEmatrix Wiki?

Guidelines for consistency

Who can contribute content to the PIEmatrix Wiki?

What to use PIEmatrix for

Why PIEmatrix and not my xls/doc/tasks etc. list?

Sample PIEmatrix Projects

Getting Access to PIEmatrix

Any Interested User

At Green Mountain Higher Education Consortium Schools

Usage Policy

PIEmatrix Login and Use

Your Own Settings

Email Settings

Log Out Timer

Projects

Getting Started

Layers versus Pie Slices versus Boxes versus Steps

Some Editing Suggestions

Issues versus Risks

  • Risk is an uncertain event, that if materialized, could alter the course of a project. Or if it materializes, it becomes a real issue. => set up a mitigation plan to help avoid a risk from turning into a real and actual problem, aka an issue
  • Issue is an actual event that has happened or is in the process of happening that is altering the course of a project until resolved. => solve it ASAP

Stacking of Projects

If you have several processes/projects going on that belong together but each has too many steps to put them all into one layer, you can stack the projects.

Examples

1st example is the Budget Office's timeline. They have:

  • monthly tasks that need to happen each month
  • an annual timeline of tasks that need to happen at certain times of the year, e.g., Board materials need to be prepared quarterly, a government report is due at a certain of the year, etc.
  • the actual budget creation timeline

In order to see how the different steps in each of the three timelines effect steps in one of the other timelines, the Budget Office created a "Stacked" Template (and project)

2nd example is a Software Implementation project. There are steps that need to be done by:

  • IT
  • the department getting the new software
  • the vendor

Steps for all three areas happen often simultaneously and are dependent on each other. So that it does not become confusing, IT, the Department, and the Vendor each get their own layer. Then these three layers are stacked into one project. This allows to create dependencies between steps done by IT vs. the Department, etc. It also allows to see the overall progress of the project. Last but not least, as you work on 'your' steps, you can just look at the layer that concerns you and your view is not cluttered by what the other 2 areas need to do

How to Stack

The Help Center has a good explanation. Remember that only layers with the same number of slices which are named the same can be stacked. That means you first create the individual layers, e.g., Department, IT, Vendor, then you create the stacked template. When you need to make changes to the template, make the change to the individual template layer, it will then flow through to your stacked template and your project which uses that stacked template (if you set the project setting to "Dynamic")

Templates

What are Templates?

  • Every Project is based on a template. Each template consists of a pie with one to several pie slices and possibly boxes and steps already added
  • A very basic template can for example have three slices that are e.g., called "Plan", "Execute", and "Close" without any boxes or steps
  • A sophisticated template can involve many slices with each several boxes and steps associated with those boxes.
  • A stacked template is template that includes several pies (all with the same amount of slices and names of slices) "stacked" on top of each other

When do you create boxes/steps in a template vs. a project?

  • If you are working on a one-time project you would choose a template that suits your needs and then add any boxes/steps on the project level
  • If you plan to do this project over and over again, you ideally create the boxes/steps on the template level as it is the template you would use again for the next time around

What do you do in Templates vs. Projects?

Assuming that this is a project you will do again and you thus would like a template that is as good as it gets so that the next time around it will be as easy as pie... to create a new project:

  • Templates:
    • Add / Delete / (Re)name Slices
    • Add / Delete / (Re)name Boxes
    • Add / Delete / (Re)name Steps and add descriptions to steps
    • Changing position of any of above
    • Assign roles to the steps
    • Update duration of a step
    • Set dependencies between steps
    • Upload files that are used as templates, instructions, etc.
  • Projects:
    • Assign the actual people who will fill the roles assigned in the template (you do this by clicking on the blue "Info" button on the upper right-hand side
    • Set dates

Available Templates

  • PIEmatrix has a "Community" were users have already and can upload templates too. You find the "Community" by clicking on "PIE Templates" on the top and then on "Template Community" written in dark blue on the right side
  • Whenever you use an existing template in your PIEmatrix instance - be mindful not to change it if other users are using it as well, instead copy it and make the adjustments to this new template that is now 'yours'
  • For Middlebury College Users:
    • The "EZ PM" template available in each Business Unit has just three slices called "Plan", "Execute", "Close", this is a good start for any new project. If you would like to use this template as a basis to create a new project in the template area, just copy the "EZ PM" template
    • There are several calendar based templates for the calendar year or by fiscal year
    • There are some imported templates like "Annual Marketing Plan", "Grant Management", "RFP Process"

Duration in Templates and how it effects Live Projects

  • If you update duration in a template for future use, it will not dynamically update any steps that have dates or are either marked in progress or completed. This is a feature to prevent any unwanted changes once the work has begun. Dynamic updates only change the not-started steps.
  • The duration on a layer is considered more of a “hint” from a schedule perspective, and subject to being overruled as the project develops. So, if the step has dates, a duration set by hand, or progress (In Progress or Completed) the duration in the project will not update when changed in the template.

What your Department should discuss before/when using PIEmatrix

  • Tags: agree on the tags. They act as the keywords by which you search for a project. Be mindful not to use for example HR and Human Resources. When searching you would need to remember to search for both HR and Human Resources to find all projects that relate to Human Resources. Also be mindful of spelling - tags cannot be deleted...
  • Naming of Projects: If you have a numbering convention or naming convention that you are using for your projects or do not have one yet at all - make sure everybody in your department knows the preferred naming method, e.g., by employee number, by project number, by area to which project belongs, etc.
  • Naming of Roles in Templates: it might be best to create role names that have a common theme at the beginning, e.g., HR Benefits Specialist, HR Retirement Specialist, HR... so that all roles related to your area show up together when you are assigning roles to steps, this will make the role assigning much faster
  • More on Roles: you are setting up a template because you will use this process again - imagine that people involved in the project change - now come up with a name for the type of person who will do this step no matter whether this year it is Sarah who is doing these steps and next year it is John because Sarah moved on - you want to have a name for the role that makes it clear what type of person should be assigned to this task

Need Technical Help with your Project?

PIEmatrix provides the best resources for technical questions about PIEmatrix use so you can get help when you need it:

  • Videos: Most pages have a link to a video on the upper right-hand side (white area) with a video specific to the page you are on.
  • Tips: Most pages also have "Tips" which explain the main parts of a page right next to the video link
  • Help Center: Click on "Help" on the upper right-hand side for access to the software's own Help Center
  • Live Chat: the link can be found at the bottom right of the Help Center when you are logged into PIEmatrix.com
  • Phone support: 802.318.4891
  • Email support: support@piematrix.com

Wiki Edit Help